Some pictures from the building of the new tank in the BMW.
It was not possible to finish everything because we decided last minute to mount a Staubli connection on the filling hose. This means that we have to change the anodized top mount plate.
We’ve already sent the modified drawings to Tempac to get the plate cut out by laser once again. After this operation it needs to be anodized again.