Since we don’t have a standard water pump we needed to fill the hole where the original pump was installed.
This was not that complex that we needed to contact our Pro E guru Nick but Co driver Luc drew it himself. Inventor for dummies 🙂
The aquajet cut the contour with a hole to weld a small tube to connect to the cold water supply.
To make it look better it passed 8h in a chemical substance with 4500A electrical shocks. This was needed to resist for years to the boiling cooling liquid.